question answered 2026-07-11

Do ERCOT's primary reports confirm the ~226 GW (Nov 2025) large-load queue, the ~63 GW end-2024 baseline, and the ~77%-data-center share?

claim-ercot-large-load-queue-quadrupled-2025-phantom-load rests on Latitude Media (Tier 2, Catherine Boudreau, Dec 2025) reporting on ERCOT's own large-load interconnection queue data. The numbers are quantitative and load-bearing, so the sourcing floor requires verification against the ERCOT primary, not the trade-press reproduction.

Specific verifications needed:

Why it matters: this is the present-day mechanism that anchors the 1935→2026 Texas-grid thread — the claim that the isolated, distinctively-regulated Texas market is where AI data-center demand is stress-testing the grid fastest. If the figures hold against ERCOT's primary, the note can move off seedling. Distinct from question-verify-lbnl-queued-up-interconnection-figures, which concerns the national generation queue (LBNL "Queued Up"), not ERCOT's large-load (demand-side) queue.

Progress log