Verify the Ni1000 defense-funding figures ($1.2M DARPA, $400,000 ONR) against a primary contract or filing
This capture directly answers the open question of whether Nestor's Ni1000
chip funding — reported by contemporaneous trade press as "$1.2m from
DARPA, $400,000 from the US Office of Naval Research" — holds
up against a primary record. It does not, cleanly. Nestor, Inc.'s own SEC
Form 10-K annual reports (fiscal years 1996 and 1997, the earliest Nestor
filings available on EDGAR — electronic filing was not mandatory until the
mid-1990s, so no earlier 10-K for the actual 1990–1993 contract years is
retrievable this way) describe the same two defense contracts in detail, with
different dollar figures than the trade-press retelling in
claim-ni1000-neural-chip-funded-by-darpa-and-onr. Both filings were
fetched and read directly (not via a search-summary layer); sec.gov 403'd
every direct tool route this session (archive_page, extract_pdf, and
WebFetch all failed with HTTP 403 — apparently a blanket block on
non-browser user agents, the same failure pattern already logged for
rand.org and ethw.org in 00-meta/specs/sources.md), so both filings were
recovered via a Google Translate proxy of the exact EDGAR URL
(www-sec-gov.translate.goog), which returns the identical underlying filing
text — confirmed by reading it: page headers, SEC accession numbers, and
"PRIVACY-ENHANCED MESSAGE" EDGAR boilerplate are all intact and match the
known filing structure. Both are cached and hashed via archive_page.
Claim: The primary filing does not confirm the $1.2M DARPA / $400,000 ONR figures — it records different, more precise numbers for two separate contracts
Claim type: quantitative (specific dollar figures). Sourcing floor: Tier 1–2 required; this rests on Tier 1 (the company's own SEC filing, filed under penalty of law).
Nestor's FY1996 and FY1997 Form 10-K filings — identical in substance on this
point — state that the DARPA development contract was "increase[d]... to
approximately $1,630,000" in April 1992, and that a separate contract "between
the Company and Office of Naval Research and administered by the Advanced
Projects Research Agency of the Department of Defense ('ARPA')," dated August
26, 1993, had a "total value... [of] $776,167." Neither figure matches the
trade-press pairing of "$1.2m from DARPA, $400,000 from... ONR" reported by
Tech Monitor and Dr. Dobb's Journal and carried (flagged
[unverified-quant]) in claim-ni1000-neural-chip-funded-by-darpa-and-onr.
This is a contradiction finding, not a confirmation: the two Tier-3 trade
retellings and the Tier-1 primary filing disagree on both dollar amounts. Per
the vault's compiled-series convention (where a compilation and a
contemporaneous primary disagree, the primary wins and the disagreement is
itself a note), the SEC figures should supersede the trade-press figures on
claim-ni1000-neural-chip-funded-by-darpa-and-onr, and that note's
[unverified-quant] flag should be resolved as "contradicted by primary,"
not "confirmed."
Provenance: Nestor, Inc. Form 10-K, FY1996 (filed 1996-09-27), "DARPA/ARPA"
subsection under "Licensing, Joint Venture and Development Agreements."
Identical figures repeated in the FY1997 10-K (filed 1998-03-31). Both
verbatim-quote-checked against the archived filing text.
source_sha: 2696fcd9b29dc2142e59dc5ea7f463416320571b5fe37c82abd57df8516f8ad2
(FY1996); source_sha: a507600a246c63335d392fae743460cd1b7fdb289439e7647ffaeca319d30294
(FY1997).
Claim: The DARPA contract began March 13, 1990 as a chip-prototype development agreement, was increased to ~$1,630,000 in April 1992, and Nestor booked ~$436,000 of DARPA-contract revenue in the fiscal year ended June 30, 1993
Claim type: quantitative + historical (dates and dollar figures). Sourcing floor: Tier 1–2 required for the figures; this rests on Tier 1.
Verbatim, from the FY1996 10-K: "The Company entered into a development agreement dated March 13, 1990 with DARPA for the development of a neural-network chip prototype embodying the Company's proprietary technology. On April 21, 1992 the Company and DARPA agreed to increase the contract to approximately $1,630,000 and extended the expected completion date to May 1993. In May 1990, the Company signed a Technology Development Agreement with Intel Corporation, under which Intel agreed to provide the design and manufacturing capabilities to satisfy the requirements of the contract with DARPA. The total cost to the Company of the subcontract with Intel is $750,000. On April 30, 1992, the cost of the subcontract was increased to $1,050,000. During the year ended June 30, 1993 the Company included in revenue approximately $436,000 relating to its work under the DARPA contract." This gives the DARPA side of the funding a specific paper trail — contract date, two amendment dates, the Intel fabrication subcontract's own cost, and one year's recognized revenue — none of which appears in the trade-press accounts.
Provenance: Nestor, Inc. Form 10-K, FY1996 (filed 1996-09-27), "DARPA/ARPA"
subsection. source_sha: 2696fcd9b29dc2142e59dc5ea7f463416320571b5fe37c82abd57df8516f8ad2.
Claim: The ONR-funded, ARPA-administered contract (dated August 26, 1993) funded the PC-compatible Ni1000 development board and environment, was completed December 1995, and totaled $776,167 — not the $400,000 reported by trade press
Claim type: quantitative + technical-mechanism (what the contract actually paid for). Sourcing floor: Tier 1–2 required; this rests on Tier 1.
Verbatim, from the FY1996 10-K: "Development of the circuit board and software were funded, in part, by a contract dated August 26, 1993, between the Company and Office of Naval Research and administered by the Advanced Projects Research Agency of the Department of Defense ('ARPA')." And, separately in the same filing's "DARPA/ARPA" subsection: "On August 26, 1993, the Company entered into a follow-on program with ARPA (formerly known as DARPA) to design and produce a PC compatible application design and development environment, comprising both hardware and software, which will enable users to incorporate the Ni1000 into products. The total value of this contract, which was completed in December 1995, was $776,167, of which approximately $423,000 was realized in fiscal 1994." The matching contract date (August 26, 1993) in both passages indicates this is one contract, described twice: ONR-funded, ARPA-administered, and specifically for the PCI 4000 circuit board (built with subcontractor Alta Technology Corporation) rather than the Ni1000 chip itself. Its value, $776,167, is nearly double the $400,000 figure in trade press.
Provenance: Nestor, Inc. Form 10-K, FY1996 (filed 1996-09-27), "Ni1000
Chip..." business-description section and "DARPA/ARPA" subsection.
source_sha: 2696fcd9b29dc2142e59dc5ea7f463416320571b5fe37c82abd57df8516f8ad2.
Further leads
- The FY1996 10-K never states the DARPA contract's original 1990 value — only that it was "increase[d]... to approximately $1,630,000" in 1992. It is possible the original, pre-1992 contract value was closer to the trade press's "$1.2m" figure, which would partially reconcile the discrepancy; this is speculation, not something the filing states, and would need the (pre-EDGAR, not electronically filed) FY1990–1993 Nestor 10-Ks or the original DARPA award record to check.
- Roland & Shiman, Strategic Computing: DARPA and the Quest for Machine Intelligence, 1983-1993 (MIT Press, 2002) — a full digitized copy was located (monoskop.org) but not fetched or read this run; it may independently document the Nestor/Ni1000 line item within the Strategic Computing Initiative budget and could serve as an independent (non-Nestor) corroborating or contradicting source for these figures.
- The FY1996 10-K's "Alta Technology" subsection gives a third, smaller figure: Nestor's subcontract with Alta Technology Corporation for the Ni1000 circuit board was "in the amount of $154,200," later "re-negotiated to $194,200," against the $776,167 total ARPA contract — a finer-grained cost breakdown not needed for the core claims above.
- The same FY1996 filing shows a separate, non-defense, partially-funded development agreement with Caltech's Jet Propulsion Laboratory (JPL), begun September 1, 1995, "total value of the contract is $597,000" — an adjacent but distinct funding stream for TrafficVision, not the Ni1000 chip.
- Direct
sec.govfetches (archive_page, extract_pdf, WebFetch) 403'd on every route tried this session, apparently blocking non-browser user agents; recovered via a Google Translate proxy of the identical EDGAR URL. Worth flagging as a new known-blocked host pattern in00-meta/specs/sources.md, alongside the existingrand.org/ethw.org/USPTO entries.
Entity candidates
- Office of Naval Research (ONR) — org/concept — co-funder named specifically in the primary filing as the counterparty on the $776,167 contract (DARPA/ARPA administered it, but ONR funded it); no vault entity page yet found in the retrieval set, despite being one of the two named defense funders in the claim under test.
- Nestor, Inc. — org — the filer of both primary documents in this capture; corporate entity behind claim-nestor-inc-commercialized-neural-nets-through-ai-winter and claim-ni1000-neural-chip-funded-by-darpa-and-onr, not yet flagged as its own entity page in prior captures on this topic.
- Alta Technology Corporation — org — subcontractor that co-developed the PCI 4000 Recognition Accelerator board under the ARPA-administered/ONR-funded contract; named with its own dollar figures in the primary filing.
- Wand Partners, Inc. — org/person-adjacent — Nestor's controlling investor from 1994 onward (preferred-stock and warrant financing detailed at length in the same 10-K); not defense-funding-related but central to Nestor's survival through this period, and absent from the vault's existing Nestor cluster.
Source
“The Company entered into a development agreement dated March 13, 1990 with DARPA for the development of a neural-network chip prototype embodying the Company's proprietary technology. On April 21, 1992 the Company and DARPA agreed to increase the contract to approximately $1,630,000 and extended the expected completion date to May 1993.”